Construction Department No. 967 (CD-967) was formed in 1983 as part of the Nadymdorstroy Trust, the Zapsibdorstroy Association of the USSR Ministry of Transport Construction in Novy Urengoy.
In 1990, the Construction Department was relocated to Khanty-Mansiysk to carry out increasing volumes of work on the construction of highways in the district and the reconstruction of the city airport. In 1998, the construction department became part of Khanty-Mansiyskdorstroy, OJSC.
Over 35 years, CD-967 has built over 25 significant major projects with a length of over 400 km.
The most significant of commissioned projects are:
— Construction of the Khanty-Mansiysk — Priobskoye field highway, section length — 68 km
— Construction of sections of the Khanty-Mansiysk — Nyagan highway, km 65 — km 181 — 116 km
— Construction of a transport interchange at the intersection of the Tyumen — Khanty-Mansiysk and Khanty-Mansiysk — airport highways — 4.1 km
— Construction of the sections of Khanty-Mansiysk — Gornopravdinsk and Tyumen — Khanty-Mansiysk highways — 34.3 km
— Entrance to the Yaguryakh village from the Khanty-Mansiysk — Nyagan highway, 4.7 km long
— Entrance to the Kamennoe village from the Khanty-Mansiysk — Nyagan highway, 11.820 km long.
— Construction and commissioning of the Khanty-Mansiysk — Gornopravdinsk highway, IX start-up complex, km 73+500 — km 105+400, 31.9 km long, and Khanty-Mansiysk — Gornopravdinsk, IV start-up complex, km 119+300 — km 153+595, 34.3 km long
— Construction of the Tynkul — Mortka highway, IX start-up complex, 30.4 km long
— Reconstruction of the Sovetsky — Lovinskoye field road, I start-up complex, II phase, km 20+40 — km 280+00, 26 km long
— Roadway replacement on 1R 402 Tyumen — Yalutorovsk — Ishim — Omsk highway, km 157+000 — km 169+000 in the Tyumen region, 12 km long
— Reconstruction of 1R 402 Tyumen — Yalutorovsk — Ishim — Omsk highway, km 77+000 — km 89+000 section, bridge over the Tobol river at km 78+543, Tyumen region, 12 km long
— Reconstruction of 1R 242 Perm — Yekaterinburg highway, km 33+415 — km 47+400 section in the Perm Territory, I start-up complex — 7.0 km
— Roadway replacement on 1R 404 Tyumen — Tobolsk — Khanty-Mansiysk highway, km 13+000 — km 22+600, in the Tyumen region, length — 9.6 km
— Reconstruction of 1R 242 Perm — Yekaterinburg highway, km 33+415 — km 47+400 section in the Perm Territory, II start-up complex — 7.931 km
— Roadway replacement on 1R 404 Tyumen — Tobolsk — Khanty-Mansiysk highway, km 22+600 — km 30+000, in the Tyumen region, length — 7.4 km
628012, Khanty-Mansi Autonomous District-Yugra, Khanty-Mansiysk, Industrialnaya st., 7
Reception tel.: +7 3467 38-81-86
HR Department tel.: +7 3467 38-81-79; доб. 3834
e-mail: 967@avtoban.ru
Alexander Sergeevich Chaban