The Voronezh branch of DSK AVTOBAN, JSC, on the basis of which CD-925, LLC was established, was founded in 1999 in Boguchar to carry out work on the reconstruction of M-4 Don highway in the Voronezh region. At the moment, the head office is located in Voronezh.

From the day of its foundation, the business unit took part in the construction and reconstruction of M-4 Don highway on sections with a total construction length of about 300 km, which is about 19% of the length of the entire highway.
The most significant projects of CD-925, LLC are:

— Reconstruction of M-4 Don highway — from Moscow through Voronezh, Rostov-on-Don, Krasnodar to Novorossiysk, including:
km 700 — km 777 section, km 1207 — km 1240 section, km 1274 — km 1285 section, km 338 — km 414.7 section
— Roadway replacement on M-4 Don highway — from Moscow through Voronezh, Rostov-on-Don, Krasnodar to Novorossiysk, including:
km 721 — km 730 section, km 687 — km 712 section, repair of M-4 Don highway section, km 401+00 — km 414+700
— Voronezh — Novovoronezh highway, Voronezh — Lugansk from the Borshchevo village
— Roadway replacement on M-7 Volga highway, km 512 — km 524 section
— М11, which is Moscow — St. Petersburg high-speed highway under construction. Construction of the Moscow — St. Petersburg high-speed highway on the km 58 — km 684 section (with subsequent toll operation), phase 1, km 58 — km 97
— Construction of the Moscow — St. Petersburg high-speed highway on the km 58 — km 684 section (with subsequent toll operation), phase 6, km 334 — km 543

— Reconstruction of M-4 Don highway from Moscow through Voronezh, Rostov-on-Don, Krasnodar to Novorossiysk on the section from km 1373+906 to km 1383+036 (Krasnodar-Dzhubga highway, km 53+906 — km 63+036) in the Krasnodar Territory
— Construction of a transport interchange on M-4 Don highway from Moscow through Voronezh, Rostov-on-Don, Krasnodar to Novorossiysk, km 1442, in the Krasnodar Territory
— Roadway replacement on M-4 Don highway from Moscow through Voronezh, Rostov-on-Don, Krasnodar to Novorossiysk on the km 1428+185 — km 1441+050 section in the Krasnodar Territory
— Construction and reconstruction of M-7 Volga highway from Moscow through Vladimir, Nizhny Novgorod, Kazan to Ufa. Construction of a transport interchange at km 18+540 of M-7 Volga highway Moscow — Vladimir — Nizhny Novgorod — Kazan — Ufa (at the junction of the bypass highway), Moscow region
— Construction and reconstruction of M-7 Volga highway from Moscow through Vladimir, Nizhny Novgorod, Kazan to Ufa. Construction of a transport interchange at km 21+312 of M-7 Volga highway Moscow — Vladimir — Nizhny Novgorod — Kazan — Ufa (at the intersection with Sovetskaya street), Moscow region
— Construction and reconstruction of M-7 Volga highway from Moscow through Vladimir, Nizhny Novgorod, Kazan to Ufa. Construction of a transport interchange at km 22+600 of M-7 Volga highway Moscow — Vladimir — Nizhny Novgorod — Kazan — Ufa (at the junction of the Leonovskoe highway), Moscow region
— Construction of the Central Ring Road of the Moscow Region. Start-Up Complex (Construction Phase) No. 3
— Construction of the Central Ring Road of the Moscow Region. Start-Up Complex (Construction Phase) No. 4

Contact information

3940261, Voronezh, Moskovsky Avenue, 7e, office 1

Reception tel.: +7 473 200-12-15

HR Department tel.: +7 473 200-12-18; доб. 6215

e-mail: 925@avtoban.ru

Director General

Maxim Alexandrovich Kirillov