Proyektno-Smetnoye Byuro, JSC was founded on March 20, 1943, and has over 70 years of experience in the development of projects for the construction, reconstruction and repair of highways. Throughout its rich history, the Proyektno-Smetnoye Byuro has constructed and reconstructed hundreds of kilometers of roads and roadside service facilities.
Proyektno-Smetnoye Byuro, JSC has a wide global reach of projects: the Chuvash Republic, the Republic of Mari El, the Republic of Tatarstan, Moscow, Nizhny Novgorod, Ulyanovsk, Penza, Saratov, Ryazan, Chelyabinsk regions.
The joint-stock company is a member of the RODOS Union of Road Design Organizations and the RODOS Union of Survey Organizations, operates on the basis of a certificate of compliance with the quality management system for activities in the field of architecture, engineering surveys, engineering design during construction, reconstruction, roadway replacement, repair of highways and airfields, bridges, flyovers and overpasses that meet the requirements of GOST R ISO 9001-2015 (ISO 9001:2015).
Proyektno-Smetnoye Byuro, JSC became a part of the AVTOBAN Group on August 28, 2008.
Proyektno-Smetnoye Byuro, JSC participated in such projects as:
— Construction and reconstruction of sections of M-36 highway, Chelyabinsk — Troitsk to the border with the Republic of Kazakhstan
— Reconstruction of the A-310 Chelyabinsk — Troitsk highway on the km 143+000 — km 144+430 section with the arrangement of entrance roads to the Bugristoe multilateral automobile checkpoint on the state border, Chelyabinsk region
— Construction and reconstruction of M-7 Kholmogory highway
— Reconstruction of M-8 Kholmogory highway on the 29 km — 35 km section
— Roadway replacement on R-158 highway, Nizhny Novgorod — Arzamas — Saransk — Issa — Penza — Saratov, on the km 171+100 — km 183+000 section
— Arrangement of artificial electric lighting on R-176 highway, Vyatka — Cheboksary — Yoshkar-Ola — Kirov — Syktyvkar in the Republic of Mari El
— Central Ring Road of the Moscow region (with subsequent toll operation). Start-Up Complex (Construction Phase) No. 3
428008, Chuvash Republic, Cheboksary, Tekstilshchikov st., 8
Reception tel.: +7 8352 64-18-18, +7 8352 64-18-97
e-mail: buro_proekt@mail.ru
Irina Ivanovna Valiullina